Project Name: Defence Project, Warehouse Extension
Project Address: 91 Terra Nova Drive, Wynyard
Client: Elphinstone Nominees
Architect: 6ty Pty Ltd
Builder: Fairbrother Pty Ltd
Structural Engineer: Collective Consulting Pty ltd
Acoustic Engineer: Tarkarri Pty Ltd
Shop Drawings: Modeltek Pty Ltd
Key Personnel: Alan Leake (Principal Structural Engineer), Christopher Polis (Assistant Engineer), Trent McCarthy (BIM Modeller)
Completion: 2024
Value: ≈ $25 million
Elphinstone Nominees operates an advanced manufacturing facility at 91 Terra Nova Drive, Wynyard, which required a significant extension to accommodate a 450-tonne vertical milling machine. This enhancement enables a level of manufacturing capability previously unseen in Tasmania, with specialised capacity to produce advanced components for various industries.
Collective was engaged to provide comprehensive structural engineering services from the feasibility stage through to construction completion. The project is designed to generate future employment opportunities and support economic revitalisation in Tasmania's Northwest region, particularly in Burnie and surrounding areas, responding to the decline of traditional manufacturing industries over the years. Our client Elphinstone remains committed to bolstering the manufacturing sector in North-West Tasmania and beyond, which we are proud to support at Collective Consulting.
The foundation design addressed the dual requirements of acoustic isolation and structural stability. Driven steel tube piles were employed for the superstructure and Continuous Flight Auger (CFA) concrete piles for the milling foundation, both extending into the soft rock substrate. A piled raft foundation was designed to evenly distribute loads to the rock foundation underlying wet structured sands while adhering to the manufacturer's deflection criteria.
An assortment of below ground acoustic insulation materials was employed during construction to achieve the necessary isolation from vibrations. Rigorous testing was conducted to confirm the effectiveness of these measures, ensuring compliance with the project specifications. Additional testing included crane vibration assessments to ensure operational integrity within the existing manufacturing environment.
Above the piles, the building substructure utilised strip and pad footings and concrete slabs, including isolation joints to mitigate vibration transfer to the machine foundation. The superstructure features a large-span structural steel shed constructed with universal beams and columns, fully detached from the existing facility to further prevent vibration transfer.
All project elements were developed using Building Information Modelling (BIM), ensuring precise geometry and complex integration, especially concerning the intricacies of the milling machine foundation, which included a multitude of inserts and anchor points specified by the manufacturer.
Throughout the construction phase, the project team managed extensive dewatering efforts due to saturated site conditions. The foundation's design accounted for potential stress on high-level footings established on the drilled steel piles. Ground slab analyses confirmed that the building's main floor did not necessitate piling, as satisfactory settlement limits were established in-situ. This design realised substantial cost savings to the client.
Collective provided oversight during all construction activities, ensuring adherence to design standards and managing stabilising ground measures and waterproofing processes for the overall structure.
Quality assurance was paramount, as the milling foundation demanded strict tolerance levels, and verification was supported through extensive 3D modelling and acoustic testing. Modeltek was engaged to prepare shop drawings utilising Trimble technology for accurate site set-outs for contractors.
Collective collaborated with Fairbrother, the builder, to create temporary formwork for the milling foundation, emphasising the importance of maintaining exceptional geometrical accuracy to allow compatibility with the machinery. Collective also undertook the reinforcement detailing to accurately schedule the complex, three-dimensional reinforcement arrangement, in lieu of standard detailing, for the milling machine foundation.
In collaboration with Elphinstone, this ambitious project represents a significant advancement in Tasmania's manufacturing capabilities, fostering job creation and economic growth. We are proud to have contributed to this vital endeavour.