Client: Milledge (TAS) Pty Ltd
Architect: LXN Architecture
Builder: Fairbrother
Structural & Civil Engineer: Collective Consulting
Key Personnel: Alan Leake (Principal Structural Engineer), Darren Bosveld (Structural Draftsman)
Construction Date: 2018
Value: $8 million
Milledge (TAS) Pty Ltd engaged Collective to provide civil and structural engineering services for the Milledge Lane Development, a three-story commercial office building on the outskirts of Launceston's Central Business District. The architectural design pays homage to Launceston's industrial heritage, situated near notable landmarks including the former gasworks, gasometer, and Boag's Brewery.
The area is characterised by soft river estuary soils, presenting significant geotechnical challenges for foundation design. The project required bored pile foundations extending approximately 10 metres into soft rock to support a brittle masonry façade on unstable soils. Collective provided feasibility studies, structural concept designs, detailed designs, and construction administration throughout the project lifecycle.
The structural design incorporated bored pile foundations, in-situ reinforced concrete beams, Bondek suspended slabs, and precast concrete firewall elements. The ground floor slab-on-grade provided economical foundation support while upper levels achieved open-plan commercial functionality.
Civil works included detailed design and documentation for the new parking facility and coordination with Cimitiere Street infrastructure upgrades. This required careful integration of underground services within the historically significant industrial precinct.
The discovery of honeycombing and voids in cantilever beams triggered an immediate engineering response. Collective collaborated with Fairbrother, the principal contractor, to conduct concrete scanning and assess the integrity of concrete surrounding cantilevered beams. The majority of the structure was found sound, with limited areas requiring remediation.
Rectification measures included:
All remediation was performed with the client fully informed, demonstrating Collective's commitment to defect identification, transparent communication, and collaborative problem-solving regardless of complexity.
Collective's operational methodology prioritises collaboration and proactive defect management. While most projects progress smoothly, construction complexities occasionally produce defects. Collective's system of checks and balances, alongside thorough inspection processes, enables prompt defect identification and resolution through contractor partnership.
This project exemplifies Collective's commitment to ensuring all engineering components meet National Construction Code standards and established design principles, safeguarding public safety and delivering high-quality, fit-for-purpose outcomes. The minor rectifications undertaken, while potentially concerning, exemplify the human element in construction with proactive and collaborative approaches achieving better outcomes than neglecting defect disclosure.
ll defects can be resolved through diligence, effort, and meticulous execution. This project exemplifies our commitment to transparent communication and collaborative problem-solving, ensuring every engineering component meets required standards regardless of construction challenges encountered.